Solar Technologies, Inc. 147 S. River Street, Suite 207, Santa Cruz, CA 95060 (831) 460-1250 or (800) SOLQUEST (765-7837) sales@solartechnologies.com |
May 18, 2001
Proposal for 4000 Watt Grid Intertie and Battery Backup Solar Electric Generation System
|
Project Site: |
|
|
Site Location: |
|
|
System Type: |
Utility intertie w/ net metering, with battery back-up, 48 VDC nominal input, 120 VAC output |
|
Total Array Power: |
4,200 Watts Peak DC |
|
Mounting: |
Collectors to be mounted flush to roof. |
|
Solar Access: |
Unshaded, nominal south facing roof area. Approximately 400 sq. ft required. |
|
Estimated Energy Production: |
5,200 kwhr/year, based on Northern California Average Solar Radiation in non-coastal areas |
We are very pleased to present this proposal for solar electric generation system. All Components are UL listed and certified for the CEC Buydown Rebate Program.
Components:
These 40 modules are to be wired in 10 series-strings of 4 modules each. Each series-string output is a nominal 48 VDC.
|
|
|
|
|
|
|
|
|
|
| TOTAL PRICE OF COMPONENTS, FOB Factory | $31,905.00 |
| Shipping charges (approx -- you will be billed for actual charges) | 650.00 |
| Sales Tax (varies with locality @8.25% | 2,632.16 |
Less CA Buydown Rebate (see below) |
(16,177.00) |
Additional Buydown available for battery system |
(750.00) |
Net Cost of Components |
$18,260.16 |
Installation:
Solar Technologies arranges complete turn-key installation and commissioning services with licensed contractors and will be glad to provide a proposal for your specific requirements. Estimated installation costs for the above system is $3,500 - $6,000 depending on the roof type and wiring requirements. If you prefer to self-install or subcontract all or part of the installation to a contractor of your choosing, Solar Technologies can provide installation coordination and engineering services for a fee.Rebates:
The California Energy Commission (CEC) Emerging Renewables Buydown Program rebates will reduce the net cost of the above system components by $16,177.00. This figure is based on the CEC certification ratings of 94.6 Watts for the Photowatt PW1000-105 Modules, and 95% efficiency for the Trace SW4048 Inverter. The CEC certification rating of 94.6 Watts/module is based on PTC (PVUSA Test Conditions) power rating which is more conservative than the STC (Standard Test Conditions) power rating of 105 Watts listed in the manufacturers specifications. The above rebate estimate is therefore based on 40 modules at 94.6 watts each multiplied by the inverter efficiency of .95 equaling 3,595 Watts CEC Certified System Rated Output. The California Buydown rate is $4.50 per watt, or 50% of the system cost, whichever is less.
* Available in CA only. The applicable "maximum" buydown for this system is $16,177.00, which is 50% of the above system cost, provided it does not exceed 50% of the systems "total cost" including the equipment cost outlined above, installation costs, permitting fees, and sales tax. You will receive a check directly from the State of California after you have completed the installation and presented a copy of the signed-off building permit.
Included in the system component pricing are the following services:
Not included in this proposal unless arranging installation through Solar Technologies:
Delivery: 3-4 weeks ARO
Quotation Validity: 30 days
Terms: 50% with order, balance due on delivery, Cash, Check, or Credit Card Accepted (small surcharge added for credit card payments)
Notes: Prices subject to change without notice. Pictures above are representational. Details of actual hardware delivered may be slightly different. We reserve the right to substitute PV collector of equal or better quality and power generation characteristics.
Thank you again for the opportunity to provide this proposal. We will look forward to working with you on this project and will do everything possible to exceed your expectations and insure your lasting satisfaction!
Sincerely,
______________________________ |
Approved by:______________________________________
Date: ____________________ |